Tanggang Road Extension Expansion Project is being implemented The expansion project of Tanggang Road was started from Yaohu Village, Tangdian Town, and passed along the west line through Shencun Village, Shuangcheng Village, Jianghuang Village, Fuzhuang Village, and the end point was connected with Guzhen Avenue. The route is located in the town of Tangdian and Gangtou, with a total length of 6.813 kilometers. It is the key traffic project in 2013 in Xinyi City.

At present, the subgrade project has been completed and 12% limestone subbase construction is underway. The project is completed in about 1km. It is planned to be completed in late July, and the test and paving of the second limestone will be completed. It will be opened to traffic in October.

Even if some difficult problems will be faced during the construction process, this will not prevent the construction from continuing. The construction staff, with their full enthusiasm and enthusiasm, will withstand the hot weather and assault the front line of the construction site regardless of their difficulties. Do your best.

Handmake Sewing

hand sewing Decorative pendant

NINGBO JINCHEN CRAFTS GIFTS CO.LT , https://www.jinchenlovecrafts.com